Skip to content
  • Monday - Friday 8:00AM-5:00PM EST
  • 352-236-5800
Icon-twitter Icon-linkedin Envelope
  • Home
  • Support
    • Search Our Knowledge Base
    • Create New Ticket
  • ICRA Training
  • Contractor Quote Request
  • About INCUE
    • Mission, Vision & Values
    • Contact Us

How can we help you?

Download INCUE

2
  • iOS Setup Instructions
  • Android Setup Instructions

Devices & Troubleshooting

6
  • Sensor Setup Instructions
  • Gateway Setup Instructions
  • “Sensor Has Not Recently Checked In” Alert
  • “Sensor has not reported” Alert
  • Gateway Tips
  • More Tips and Tricks

Project Specific Training Videos

9
  • Global App Notification Training
  • Project Specific Notification Training
  • Completion Tasks Training
  • Alert Training
  • Daily Checklist Training
  • Planning and Installation Checklist Training
  • Sensor Training
  • Documentation Training
  • Team Add Training

In App Reporting

1
  • Generating Reports

Project Start

2
  • Quick Start Guide
  • Project Start Training

Sensor Relocation

1
  • How To Relocate Sensors

Support Documents

1
  • Frequently Asked Questions
  • Home
  • Support Knowledge Base
  • Sensor Setup Instructions
View Categories

Sensor Setup Instructions

Your Sensor Setup instructions are easy to follow.

Your Air Quality Sensor, Temperature/Humidity Sensor, and Differential Pressure Sensor require (2) Double AA Batteries each. Your Differential Pressure and Air Quality Sensor also have a USB cable that will come with it.

If you choose to have your sensors plugged in, this will eliminate having to replace the batteries throughout your project’s timeline.

If you are unable to have your sensors plugged in at all times, your Air Quality Sensor batteries will need to be replaced EVERY 2-3 WEEKS. Your Differential Pressure Sensor and Temperature/Humidity Sensor batteries have 1 year’s battery life.

** Note that your training video tab does include Sensor training for adding sensors to your INCUE Project.

Still stuck? How can we help?

How can we help?

Let's modernize ICRA together.

Contact Us

Bridging the gap between construction and patient safety.

Icon-twitter Icon-linkedin Envelope

Useful Links

  • Training & Certifications
  • Support Knowledge Base
  • About INCUE
  • Contact Us
  • Terms of Service, Privacy Policy, and Acceptable Use

Contact Info

  • 600 Bypass Drive
    Suite 223
    Clearwater FL 33764
  • Mon-Fri 8AM-5PM EST
  • [email protected]
  • 352-236-5800

Recent Post

  • 08 May 2024 Modernization
    Advancing Infection Prevention in Healthcare Construction: The Urgent Need for Modernization

Copyright © 2023 INCUE LLC, All rights reserved.